← Back to map

Allen 2 BESSPlanned

Gaston County, North Carolina · EIA plant ID 69148 · Operator: Duke Energy Carolinas, LLC
BatteryBA: DUK

167 MW planned (Batteries), first expected Jul 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BESS1BatteriesBA167167planned Jul 2027Planned—coming soon

Owner / operator

Operator: Duke Energy Carolinas, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
G G Allenretired0.3 km
Allen 1 Battery Energy Storage System50 MW1.6 km
DE Solar 10240 Old Dowd Rdretired6.1 km
Reventure Park4 MW11.4 km
Gaston Memorial Hospital2 MW14.8 km
DE Solar 1725 Drywall Drretired15 km