NJ - CS Energy - Berkeley 1
Ocean County, New Jersey · EIA plant ID 69097 · Operator: Eagles Solar I, LLC
Nameplate4MWSummer 4 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor10%solar units, summer MW
Heat rate—thermal plants only
First online2024
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2024 | 0 | 0.0% | — |
| 2025 | 3.4 | 9.7% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| BRKL1 | Solar Photovoltaic | PV | 4 | 4 | Apr 2024 | Operating | — | coming soon |
Owner / operator
Operator: Eagles Solar I, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Eagles Solar I, LLC | 100.0% | 4 MW |
Nearby plants
Within 80 km.
| NJ - CS Energy - Berkeley II | 4 MW | 0 km |
| Bayville Central Facility | 7 MW | 4.9 km |
| EDF Ph1 Toms River | 21 MW | 8.8 km |
| Toms River CSG | 4 MW | 9.2 km |
| Forked River | 77 MW | 10.2 km |
| Tom's River (Lowes) | 1 MW | 10.7 km |