← Back to map

Lone Star Power StationPlanned

San Jacinto County, Texas · EIA plant ID 69077 · Operator: Entergy Texas Inc.
Natural gasMISOBA: MISO

467 MW planned (Natural Gas Fired Combustion Turbine), first expected Jul 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1ANatural Gas Fired Combustion TurbineGT467.3432planned Jul 2028Planned—coming soon

Owner / operator

Operator: Entergy Texas Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
San Jacinto County Peaking Facility170 MW0.7 km
RC Thomas Hydroelectric Project27 MW24.3 km
Lupinus Solar 2, LLC—26.1 km
Lupinus Solar 1, LLC—26.1 km
Securityretired26.2 km
Votaw Solar Station—33 km