Lupinus Solar 1, LLCUnder construction

Franklin County, Texas · EIA plant ID 66895 · Operator: Sunraycer Assets I LLC
SolarERCOTBA: ERCO

248 MW under construction (Batteries, Solar Photovoltaic), first expected Sep 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 248 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
LP1BABatteriesBA8383planned Sep 2027Under construction—coming soon
LP1PVSolar PhotovoltaicPV165165planned Sep 2027Under construction—coming soon

Owner / operator

Operator: Sunraycer Assets I LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Lupinus Solar 2, LLC—0 km
Securityretired2.4 km
Lone Star Power Station—26.1 km
San Jacinto County Peaking Facility170 MW26.8 km
WAL6021 MW27.7 km
Lewis Creek543 MW29.3 km