Country Acres Clean Power LLCUnder construction
Placer County, California · EIA plant ID 68940 · Operator: Clenera DevCo LLC
516 MW under construction (Batteries, Solar Photovoltaic), first expected Feb 2027 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service · 516 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| CABS | Batteries | BA | 172 | 172 | planned Feb 2027 | Under construction | — | coming soon |
| CAPV | Solar Photovoltaic | PV | 344 | 344 | planned Feb 2027 | Under construction | — | coming soon |
Owner / operator
Operator: Clenera DevCo LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Roseville Energy Park | 225 MW | 5.8 km |
| Wildflower Solar 1 | 13 MW | 7 km |
| Roseville | 66 MW | 10.7 km |
| CA - Amazon - SMF6 | 3 MW | 11.1 km |
| McClellan (CA) | 77 MW | 11.3 km |
| CA- US Foods- Sacramento (McClellan) | 1 MW | 11.4 km |