← Back to map

Sawtooth SolarPlanned

Pinal County, Arizona · EIA plant ID 68883 · Operator: edf renewables development, inc.
BatteryBA: AZPS

500 MW planned (Batteries, Solar Photovoltaic), first expected Jun 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
STBABatteriesBA250250planned Jun 2028Planned—coming soon
STPVSolar PhotovoltaicPV250250planned Jun 2028Planned—coming soon

Owner / operator

Operator: edf renewables development, inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Kitt Solar—5.6 km
West Line Solar, LLC100 MW7.6 km
Central Line Solar, LLC100 MW13.1 km
East Line Solar100 MW14.5 km
Eleven Mile Solar Center600 MW15.2 km
Selma Energy Center—16.7 km