Minco II Energy Storage
Grady County, Oklahoma · EIA plant ID 68802 · Operator: Minco II Energy Storage LLC
Nameplate65MWSummer 65 MW
Generators1in service
Net generation-13GWh12 mo to Aug 2026
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2025
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2025 | -9.4 | — | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| MINS2 | Batteries | BA | 65 | 65 | May 2025 | Operating | — | coming soon |
Owner / operator
Operator: Minco II Energy Storage LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Minco II Energy Storage LLC | 100.0% | 65 MW |
Nearby plants
Within 80 km.
| Redbed Plains Wind Farm | 99 MW | 3.7 km |
| Tuttle | 4 MW | 5.9 km |
| Minco Wind I, LLC | 99 MW | 8.1 km |
| Rumble Solar | — | 9.6 km |
| Minco Wind II, LLC | 101 MW | 16.5 km |
| Frontier | 131 MW | 26.3 km |