Minco Wind II, LLC
Grady County, Oklahoma · EIA plant ID 57956 · Operator: FPLE Wind, LLC
Nameplate101MWSummer 101 MW
Generators1in service
Net generation323GWh12 mo to Dec 2025
Capacity factor37%wind units, summer MW
Heat rate—thermal plants only
First online2011
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2011 | 76.3 | 51.7% | — |
| 2012 | 380.2 | 42.9% | — |
| 2013 | 364.8 | 41.3% | — |
| 2014 | 395.7 | 44.8% | — |
| 2015 | 342.3 | 38.8% | — |
| 2016 | 382.1 | 43.1% | — |
| 2017 | 360.2 | 40.8% | — |
| 2018 | 350.8 | 39.7% | — |
| 2019 | 351.1 | 39.8% | — |
| 2020 | 337.7 | 38.1% | — |
| 2021 | 295.1 | 33.4% | — |
| 2022 | 379 | 42.9% | — |
| 2023 | 296.5 | 33.6% | — |
| 2024 | 251 | 28.3% | — |
| 2025 | 323.1 | 36.6% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Onshore Wind Turbine | WT | 100.8 | 100.8 | Nov 2011 | Operating | — | ge 1.6 XLE |
Owner / operator
Operator: FPLE Wind, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| FPLE Wind, LLC | 100.0% | 101 MW |
Nearby plants
Within 80 km.
| Rumble Solar | — | 7.6 km |
| Minco Wind I, LLC | 99 MW | 10 km |
| Minco Wind III, LLC | 101 MW | 11.4 km |
| Minco II Energy Storage | 65 MW | 16.5 km |
| Minco Wind IV, LLC | 130 MW | 19 km |
| Redbed Plains Wind Farm | 99 MW | 20.1 km |