← Back to map

Tracy 18 - SLCVA418

San Joaquin County, California · EIA plant ID 68794 · Operator: Prologis Logistics Services Incorporated
SolarBatteriesSolar PhotovoltaicCAISOBA: CISO
Nameplate3MWSummer 3 MW
Generators2in service
Net generation0GWh12 mo to Dec 2025
Capacity factor5%solar units, summer MW
Heat rate—thermal plants only
First online2025

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060MWh2025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%2%4%202520265.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20250.25.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BS418BatteriesBA1.51.5Feb 2026Operating—coming soon
CV418Solar PhotovoltaicPV1.51.5Oct 2025Operating—coming soon

Owner / operator

Operator: Prologis Logistics Services Incorporated. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Prologis Logistics Services Incorporated100.0%3 MW

Nearby plants

Within 80 km.
Tracy Renewable Power Plant—3.8 km
Tracy Linne3 MW7 km
Zeus BESS—9.9 km
Tracy BESS—10 km
Tracy Combined Cycle Power Plant336 MW10.2 km
Medline Ind. Phase 2 Tracy1 MW10.8 km