Zeus BESSPlanned

San Joaquin County, California · EIA plant ID 69654 · Operator: Zeus BESS LLC
BatteryCAISOBA: CISO

214 MW planned (Batteries), first expected Sep 2031 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ZEUBBatteriesBA213.6200planned Sep 2031Planned—coming soon

Owner / operator

Operator: Zeus BESS LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Tracy BESS—0.1 km
Tracy Combined Cycle Power Plant336 MW0.2 km
Foundation ST2 MW2.9 km
Medline Ind. Phase 2 Tracy1 MW3.1 km
Tracy 2103 MW3.9 km
Prologis L.P3 MW3.9 km