← Back to map

Sand Luis WestPlanned

Fresno County, California · EIA plant ID 68673 · Operator: Origis Energy USA, Inc
SolarCAISOBA: CISO

156 MW planned (Batteries, Solar Photovoltaic), first expected Nov 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
OESLWSolar PhotovoltaicPV125125planned Nov 2028Planned—coming soon
SLW_SBatteriesBA31.331.3planned Nov 2028Planned—coming soon

Owner / operator

Operator: Origis Energy USA, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Huron Solar Station20 MW2.6 km
Westlands Solar PV Farm18 MW3.8 km
Fifth Standard Solar PV, LLC (Hybrid)287 MW4.8 km
Gates Solar Station20 MW5.5 km
West Gates Solar Station10 MW7.6 km
Key Energy Storage—7.7 km