Fifth Standard Solar PV, LLC (Hybrid)

Fresno County, California · EIA plant ID 64197 · Operator: RWE Clean Energy
SolarBatteriesSolar PhotovoltaicCAISOBA: CISO
Nameplate287MWSummer 267 MW
Generators2in service
Net generation335GWh12 mo to Aug 2026
Capacity factor27%solar units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-10010203040GWh202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2023202420252026202727.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202361.415.7%—
2024321.326.1%—
2025301.124.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
FTHSBBatteriesBA137117Sep 2023Operating—coming soon
FTHSSSolar PhotovoltaicPV150150Sep 2023Operating—coming soon

Owner / operator

Operator: RWE Clean Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
RWE Clean Energy100.0%287 MW

Nearby plants

Within 80 km.
Gates Solar Station20 MW2.7 km
West Gates Solar Station10 MW2.8 km
Key Energy Storage—3 km
Westlands Solar PV Farm18 MW3.1 km
Sand Luis West—4.8 km
Huron Solar Station20 MW7.3 km