Dahlia EnergyPlanned
La Salle County, Texas · EIA plant ID 68604 · Operator: Dahlia Energy LLC
300 MW planned (Batteries, Solar Photovoltaic), first expected Jun 2028 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| DALBS | Batteries | BA | 100 | 100 | planned Jun 2028 | Planned | — | coming soon |
| DALPV | Solar Photovoltaic | PV | 200 | 200 | planned Jun 2028 | Planned | — | coming soon |
Owner / operator
Operator: Dahlia Energy LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Cotulla BESS 1 | 10 MW | 29 km |
| La Salle ESS | — | 31.8 km |
| La Salle Solar | — | 32 km |
| Holcomb (TX) | 10 MW | 53.6 km |
| Reis Solar Park | — | 59.3 km |
| Hecate Energy Outpost Solar LLC | 515 MW | 59.9 km |