← Back to map

Reis Solar ParkPlanned

Atascosa County, Texas · EIA plant ID 67564 · Operator: Greenalia Solar Power Reis, LLC
SolarERCOTBA: ERCO

106 MW planned (Solar Photovoltaic), first expected May 2029 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
REGSPSolar PhotovoltaicPV105.5105.5planned May 2029Planned—coming soon

Owner / operator

Operator: Greenalia Solar Power Reis, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
San Miguel410 MW6.2 km
Regis Lyssy10 MW41.9 km
Sparta Solar250 MW44.1 km
Poteet10 MW45.5 km
Helena Wind268 MW50.5 km
FELPS 7- Floresville West1 MW59.2 km