Pineview Solar, LLC
Wilcox County, Georgia · EIA plant ID 68549 · Operator: Pineview Solar, LLC
Nameplate80MWSummer 80 MW
Generators1in service
Net generation64GWh12 mo to Aug 2026
Capacity factor27%solar units, summer MW
Heat rate—thermal plants only
First online2026
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| PNVW1 | Solar Photovoltaic | PV | 80 | 80 | May 2026 | Operating | — | coming soon |
Owner / operator
Operator: Pineview Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Pineview Owner LLC | 100.0% | 80 MW |
Nearby plants
Within 80 km.
| SR Rochelle II | — | 5.3 km |
| SR Rochelle I | — | 11.6 km |
| Lake Blackshear Project | 17 MW | 41 km |
| Crisp Plant | 23 MW | 41 km |
| Coody Cochran | 3 MW | 44.3 km |
| CG PS Portfolio 1, LLC | 2 MW | 45.2 km |