Crisp Plant
Worth County, Georgia · EIA plant ID 753 · Operator: Crisp County Power Comm
Nameplate23MWSummer 19 MW
Generators3in service
Net generation0GWh12 mo to Dec 2025
Capacity factor0%gas/coal/oil units, summer MW
Heat rate16,633Btu/kWhfossil units, electric fuel, HHV
First online1957Runs as rarely runs
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 1.9 | — | — |
| 2002 | 1.2 | — | — |
| 2003 | 7.9 | 5.1% | 16,631 |
| 2004 | 3.3 | 2.7% | 24,286 |
| 2005 | 1.3 | 1.1% | 23,687 |
| 2006 | -0.1 | -0.1% | — |
| 2007 | 0.9 | 0.7% | 19,378 |
| 2008 | 0.7 | 0.6% | — |
| 2009 | 0.2 | 0.1% | 20,763 |
| 2010 | 0.8 | 0.7% | 22,210 |
| 2011 | 0.2 | 0.1% | — |
| 2012 | 0.3 | 0.3% | 25,176 |
| 2013 | 0.2 | 0.1% | — |
| 2014 | 0.5 | 0.4% | 29,188 |
| 2015 | 0.4 | 0.3% | 25,757 |
| 2016 | 1.5 | 1.2% | 28,323 |
| 2017 | 2.7 | 2.2% | 24,773 |
| 2018 | 0.1 | 0.1% | — |
| 2019 | 0.1 | 0.1% | 27,730 |
| 2020 | 0 | 0.0% | — |
| 2021 | 0 | 0.0% | — |
| 2022 | 0 | 0.0% | — |
| 2023 | 0.9 | 0.6% | 13,319 |
| 2024 | 0.2 | 0.1% | 13,956 |
| 2025 | 0.3 | 0.2% | 16,633 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Natural Gas Steam Turbine | ST | 12.5 | 10 | Jun 1957 | Operating (Out of service) | — | coming soon |
| GT1 | Natural Gas Fired Combustion Turbine | GT | 5 | 4 | May 1957 | Operating (Out of service) | — | coming soon |
| GT2 | Natural Gas Fired Combustion Turbine | GT | 5 | 5 | Jun 2023 | Operating | — | coming soon |
Owner / operator
Operator: Crisp County Power Comm. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Crisp County Power Comm | 100.0% | 23 MW |
Nearby plants
Within 80 km.
| Lake Blackshear Project | 17 MW | 0.4 km |
| SR DeSoto III | 60 MW | 6.8 km |
| SR DeSoto I, LLC | 165 MW | 8.9 km |
| SR DeSoto II | 65 MW | 9.4 km |
| Flint River | 5 MW | 33 km |
| Brady Solar LLC | 2 MW | 34.1 km |