AGATE BESSPlanned

Kitsap County, Washington · EIA plant ID 68366 · Operator: BrightNight Power
BatteryBA: PSEI

170 MW planned (Batteries), first expected Feb 2029 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
AGATBatteriesBA170170planned Feb 2029Planned—coming soon

Owner / operator

Operator: BrightNight Power. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
West Point Treatment Plant5 MW17 km
Rocky Brook Hydroelectric2 MW25.7 km
University of Washington Power Plant15 MW26.1 km
MESA 1retired32.7 km
MESA 2retired38 km
Port Townsend Paper8 MW38.7 km