← Back to map

Port Townsend Paper

Jefferson County, Washington · EIA plant ID 50544 · Operator: Port Townsend Paper Co
OtherWood/Wood Waste BiomassBA: BPAT
Nameplate8MWSummer 8 MW
Generators1in service
Net generation8GWh12 mo to Dec 2025
Capacity factor5%other units, summer MW
Heat rate4,674Btu/kWhfossil units, electric fuel, HHV
First online1986

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02.557.510GWh200120032006200820102012201420162018202020232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%200520102015202020255.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
2,5005,0007,50010,00012,500200520102015202020254,674 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200158.436.7%—
200257.148.5%—
20031.9——
200450.147.0%4,863
200648.275.1%4,863
200749.848.0%4,864
200841.7—12,210
20093825.3%4,530
20103630.2%4,530
201135.529.9%4,530
201236.634.2%4,530
201332.931.8%4,531
201434.134.8%4,531
201524.824.7%4,717
201631.139.5%4,675
201733.948.4%4,676
20183751.6%4,674
201938.351.8%4,675
202039.650.4%4,675
202130.537.7%4,676
202335.351.1%4,499
20242.63.4%4,673
20257.710.5%4,674

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN6Wood/Wood Waste BiomassST7.57.5Jan 1986Operating—coming soon
GEN5Wood/Wood Waste BiomassST7.57Jan 1986not_current—coming soon
GEN2Wood/Wood Waste BiomassST33Jan 1929Retired Jan 2009—coming soon
GEN4Wood/Wood Waste BiomassST33Jan 1929Retired Apr 2016—coming soon
HDROConventional HydroelectricHY0.40.3Aug 1982Retired Sep 2012—coming soon

Owner / operator

Operator: Port Townsend Paper Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Port Townsend Paper Co100.0%8 MW

Nearby plants

Within 80 km.
AGATE BESS—38.7 km
Rocky Brook Hydroelectric2 MW42.9 km
MESA 1retired44.4 km
March Point Cogeneration140 MW45.5 km
MESA 2retired46.4 km
Sierra Pacific Burlington Facility28 MW47.7 km