← Back to map

Grand Valley Solar Generation and BESSPlanned

Mesa County, Colorado · EIA plant ID 68343 · Operator: GRVA bn, LLC
SolarBA: PSCO

200 MW planned (Batteries, Solar Photovoltaic), first expected Oct 2029 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GRVA1Solar PhotovoltaicPV100100planned Oct 2029Planned—coming soon
GRVA2BatteriesBA100100planned Oct 2029Planned—coming soon

Owner / operator

Operator: GRVA bn, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Fruita27 MW8 km
Mesa CSG 1 Murdock2 MW15.6 km
Redlands Water & Power1 MW21.9 km
Mesa PV12 MW27.7 km
Pivot Solar 57 LLC—32.8 km
USS Fruita Solar LLC CSG2 MW33.1 km