← Back to map

Mesa CSG 1 Murdock

Mesa County, Colorado · EIA plant ID 62719 · Operator: Standard Solar
SolarSolar PhotovoltaicBA: PSCO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor29%solar units, summer MW
Heat rate—thermal plants only
First online2019

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2019202020212022202320242025202628.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20192.528.1%—
20203.425.7%—
20213.929.3%—
20223.627.7%—
20233.627.0%—
20243.828.6%—
20253.828.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
X0038Solar PhotovoltaicPV1.51.5May 2019Operating—coming soon

Owner / operator

Operator: Standard Solar. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Standard Solar100.0%2 MW

Nearby plants

Within 80 km.
Redlands Water & Power1 MW6.4 km
Fruita27 MW8.4 km
Mesa PV12 MW12.5 km
Grand Valley Solar Generation and BESS—15.6 km
Pivot Solar 57 LLC—17.7 km
USS Fruita Solar LLC CSG2 MW19.1 km