Centralia Battery Energy Storage SystemPlanned

Thurston County, Washington · EIA plant ID 68282 · Operator: CENT bn, LLC
BatteryBA: PSEI

200 MW planned (Batteries), first expected Dec 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CENTBatteriesBA200200planned Dec 2028Planned—coming soon

Owner / operator

Operator: CENT bn, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Transalta Centralia Generation730 MW3.3 km
Skookumchuck1 MW12.6 km
Chehalis Generating Facility593 MW17.6 km
Skookumchuck Wind Facility136 MW18.5 km
Yelm12 MW28.8 km
Mayfield162 MW38.2 km