← Back to map

Chehalis Generating FacilityRetirement planned

Lewis County, Washington · EIA plant ID 55662 · Operator: PacifiCorp
Natural gasNatural Gas Fired Combined CycleBA: BPAT
Nameplate593MWSummer 477 MW
Generators3in service
Net generation2,511GWh12 mo to Aug 2026
Capacity factor60%gas/coal/oil units, summer MW
Heat rate7,495Btu/kWhfossil units, electric fuel, HHV
First online2003Runs as baseload

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-1000100200300GWh200420062008201020122014201620182020202220242026

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202560.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,5007,0007,500200520102015202020257,495 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2003524.328.8%7,117
20042,548.158.6%7,050
20052,240.951.7%6,753
20061,31630.3%7,429
20071,887.543.5%7,147
20082,090.148.1%7,460
20091,747.339.2%7,429
20101,288.228.9%7,513
201166514.9%7,695
2012849.420.3%7,825
20131,674.240.1%7,414
20142,543.860.9%7,721
20151,09326.2%7,680
20161,42033.9%7,719
20171,758.942.1%7,615
20181,74241.7%7,430
20192,431.558.2%7,381
20202,407.357.5%7,438
20212,248.253.8%7,498
20222,17252.0%7,416
20232,23953.6%7,525
20242,651.963.3%7,458
20252,337.455.9%7,595

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CANatural Gas Fired Combined CycleCA195.5157Aug 2003Operating · retirement plannedDec 2043coming soon
CT1Natural Gas Fired Combined CycleCT198.9160Aug 2003Operating · retirement plannedDec 2043coming soon
CT2Natural Gas Fired Combined CycleCT198.9160Aug 2003Operating · retirement plannedDec 2043coming soon

Owner / operator

Operator: PacifiCorp. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
PacifiCorp100.0%593 MW

Nearby plants

Within 80 km.
Transalta Centralia Generation730 MW15.4 km
Centralia Battery Energy Storage System—17.6 km
Skookumchuck1 MW23.3 km
Mayfield162 MW28.1 km
Skookumchuck Wind Facility136 MW31.7 km
Mossyrock300 MW38.6 km