← Back to map

Gemstone Solar LLCPlanned

Cass County, Michigan · EIA plant ID 68061 · Operator: Clenera DevCo LLC
SolarPJMBA: PJM

150 MW planned (Solar Photovoltaic), first expected Oct 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEMPVSolar PhotovoltaicPV150150planned Oct 2028Planned—coming soon

Owner / operator

Operator: Clenera DevCo LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Indeck Niles Energy Center1,174 MW14.8 km
St. Joseph Solar20 MW19.1 km
French Paper Hydro1 MW19.4 km
Elkhart3 MW23.7 km
Twin Branch PV3 MW23.7 km
Berrien Springs7 MW23.8 km