Gemstone Solar LLCPlanned
Cass County, Michigan · EIA plant ID 68061 · Operator: Clenera DevCo LLC
150 MW planned (Solar Photovoltaic), first expected Oct 2028 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GEMPV | Solar Photovoltaic | PV | 150 | 150 | planned Oct 2028 | Planned | — | coming soon |
Owner / operator
Operator: Clenera DevCo LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Indeck Niles Energy Center | 1,174 MW | 14.8 km |
| St. Joseph Solar | 20 MW | 19.1 km |
| French Paper Hydro | 1 MW | 19.4 km |
| Elkhart | 3 MW | 23.7 km |
| Twin Branch PV | 3 MW | 23.7 km |
| Berrien Springs | 7 MW | 23.8 km |