Robeson Solar IPlanned

Robeson County, North Carolina · EIA plant ID 68043 · Operator: aes clean energy
SolarBA: CPLE

108 MW planned (Batteries, Solar Photovoltaic), first expected Dec 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ROBESSolar PhotovoltaicPV8080planned Dec 2028Planned—coming soon
ROBSSBatteriesBA2828planned Dec 2028Planned—coming soon

Owner / operator

Operator: aes clean energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Barker Solar, LLC5 MW2.4 km
FLS Solar 170, LLC2 MW3.6 km
FLS Solar 200, LLC4 MW3.7 km
Bo Biggs Solar5 MW3.9 km
W H Weatherspoon163 MW4.8 km
Lumberton35 MW6.3 km