← Back to map

Lumberton

Robeson County, North Carolina · EIA plant ID 10382 · Operator: NC Renewable Power - Lumberton LLC
OtherWood/Wood Waste BiomassBA: CPLE
Nameplate35MWSummer 35 MW
Generators1in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online1985

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh200120032005200720092016201820202022

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%201520162017201820192020202120222023

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
010,00020,00030,00020022004200620082010
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20016.9—29,470
200290.7—14,523
200383.3—12,424
200430.2—11,740
20050——
20069—10,587
200715.2—11,737
200817.3—11,247
20094.3—12,438
201520.16.6%—
201641.413.6%—
2017159.352.4%—
2018133.744.0%—
2019133.644.0%—
202095.831.4%—
202100.0%—
202200.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Wood/Wood Waste BiomassST34.734.7Dec 1985Operating—coming soon
Gen1Conventional Steam CoalST34.732.5Dec 1985not_current—coming soon

Owner / operator

Operator: NC Renewable Power - Lumberton LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
NC Renewable Power - Lumberton LLC100.0%35 MW

Nearby plants

Within 80 km.
W H Weatherspoon163 MW2 km
FLS Solar 170, LLC2 MW2.7 km
Stone Solar5 MW3.3 km
Bo Biggs Solar5 MW4.4 km
Jersey Holdings5 MW4.7 km
FLS Solar 200, LLC4 MW5.3 km