← Back to map

Lemoore West

Kings County, California · EIA plant ID 68027 · Operator: Leprino Foods
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate8MWSummer 8 MW
Generators1in service
Net generation17GWh12 mo to Dec 2025
Capacity factor24%solar units, summer MW
Heat rate—thermal plants only
First online2022

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.511.5GWh20242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20242025202624.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202414.420.8%—
202516.724.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
LEW1Solar PhotovoltaicPV7.97.9Dec 2022Operating—coming soon

Owner / operator

Operator: Leprino Foods. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Leprino Foods100.0%8 MW

Nearby plants

Within 80 km.
Lemoore 12 MW5.1 km
RE Kansas Solar, LLC20 MW5.9 km
Java Solar, LLC14 MW7.4 km
Kings CSG 3 LLC Community Solar3 MW8.1 km
RE Kansas South LLC20 MW8.3 km
Henrietta Solar Project102 MW9.2 km