RE Kansas Solar, LLC

Kings County, California · EIA plant ID 58985 · Operator: Novatus Energy
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate20MWSummer 20 MW
Generators1in service
Net generation24GWh12 mo to Dec 2025
Capacity factor14%solar units, summer MW
Heat rate—thermal plants only
First online2014

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh20152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%201420162018202020222024202613.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20141.912.6%—
20155028.5%—
201653.730.6%—
201753.430.5%—
201852.630.0%—
201949.628.3%—
20204525.6%—
202147.226.9%—
202243.224.7%—
202338.722.1%—
202435.720.3%—
20252413.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV2020Dec 2014Operating—coming soon

Owner / operator

Operator: Novatus Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Novatus Energy100.0%20 MW

Nearby plants

Within 80 km.
Java Solar, LLC14 MW2.2 km
RE Kansas South LLC20 MW2.4 km
Lemoore 12 MW3.4 km
Henrietta Solar Project102 MW4.1 km
Kings CSG 3 LLC Community Solar3 MW4.6 km
American Kings Solar, LLC128 MW5.8 km