American Kings Solar, LLC

Kings County, California · EIA plant ID 60777 · Operator: GSRP
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate128MWSummer 128 MW
Generators1in service
Net generation266GWh12 mo to Aug 2026
Capacity factor24%solar units, summer MW
Heat rate—thermal plants only
First online2020

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2020202120222023202420252026202723.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202014.315.0%—
2021310.327.7%—
2022279.824.9%—
202327024.1%—
2024323.928.8%—
2025324.428.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN01Solar PhotovoltaicPV128128Dec 2020Operating—coming soon

Owner / operator

Operator: GSRP. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
American Kings Solar, LLC100.0%128 MW

Nearby plants

Within 80 km.
Electrolyte BESS99 MW0.6 km
Henrietta Peaker98 MW0.6 km
Henrietta D Energy Storage LLC10 MW1.4 km
Slate Hybrid440 MW1.5 km
Kings CSG 3 LLC Community Solar3 MW1.5 km
RE Kent South, LLC20 MW1.7 km