Baldwin County, Alabama · EIA plant ID 68002 · Operator: Foley Solar, LLC
80 MW under construction (Solar Photovoltaic), first expected Oct 2026 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service · 80 MW building
Net generation29GWh12 mo to Aug 2026
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| FOLEY | Solar Photovoltaic | PV | 80 | 80 | planned Oct 2026 | Under construction | — | coming soon |
Owner / operator
Operator: Foley Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Shell Offshore Yellowhammer | retired | 38.6 km |
| Perdido | 3 MW | 38.8 km |
| Gulf Coast Solar Center III | 50 MW | 39 km |
| Theodore Cogen Facility | 317 MW | 41.8 km |
| ExxonMobil Mobile Bay Onshore | 12 MW | 44 km |
| International Paper Pensacola | 83 MW | 45.5 km |