City of Long Beach Airport Lot A & B
Los Angeles County, California · EIA plant ID 67994 · Operator: Solar DG CA Long Beach, LLC
Nameplate2MWSummer 1 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor33%solar units, summer MW
Heat rate—thermal plants only
First online2024
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2024 | 2.8 | 29.4% | — |
| 2025 | 3.4 | 32.6% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| COLBA | Solar Photovoltaic | PV | 1.8 | 1.2 | Feb 2024 | Operating | — | coming soon |
Owner / operator
Operator: Solar DG CA Long Beach, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Solar DG CA Long Beach, LLC | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| Signal Hill West Unit | 6 MW | 3.2 km |
| CSU Long Beach Lots 7 & 14 | 5 MW | 4.6 km |
| CSU Long Beach | 3 MW | 4.6 km |
| AES ES Alamitos 2 LLC | 82 MW | 6.3 km |
| AES ES Alamitos, LLC | 100 MW | 6.3 km |
| AES Alamitos LLC | 1,115 MW | 6.4 km |