AES Alamitos LLCRetirement planned
Los Angeles County, California · EIA plant ID 315 · Operator: AES Alamitos LLC
Nameplate1,115MWSummer 1,142 MW
Generators3in service
Net generation8GWh12 mo to Aug 2026
Capacity factor0%gas/coal/oil units, summer MW
Heat rate16,289Btu/kWhfossil units, electric fuel, HHV
First online1961Runs as rarely runs
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 8,525.9 | — | — |
| 2002 | 4,101.4 | — | — |
| 2003 | 3,538.3 | 19.1% | 11,094 |
| 2004 | 2,954.4 | 16.8% | 11,860 |
| 2005 | 1,311.1 | 7.5% | 11,715 |
| 2006 | 1,792.4 | 10.3% | 11,560 |
| 2007 | 1,476.3 | 8.4% | 11,089 |
| 2008 | 2,534.4 | 14.4% | 10,871 |
| 2009 | 1,718.2 | 9.8% | 11,058 |
| 2010 | 881.4 | 5.0% | 11,125 |
| 2011 | 1,025.4 | 5.9% | 12,419 |
| 2012 | 1,464.7 | 8.3% | 12,154 |
| 2013 | 1,528.9 | 8.7% | 10,830 |
| 2014 | 1,369.7 | 7.8% | 11,401 |
| 2015 | 1,052.8 | 6.0% | 11,863 |
| 2016 | 889.4 | 5.1% | 12,380 |
| 2017 | 855.1 | 4.9% | 11,777 |
| 2018 | 958.3 | 5.5% | 12,891 |
| 2019 | 581.1 | 3.5% | 13,891 |
| 2020 | 544.3 | 5.4% | 13,022 |
| 2021 | 536.8 | 5.3% | 13,259 |
| 2022 | 630.5 | 6.3% | 13,075 |
| 2023 | 598.3 | 5.9% | 14,190 |
| 2024 | 34 | 0.3% | 15,834 |
| 2025 | 28.2 | 0.3% | 13,417 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 3 | Natural Gas Steam Turbine | ST | 310 | 327 | Dec 1961 | Operating · retirement planned | Dec 2026 | coming soon |
| 4 | Natural Gas Steam Turbine | ST | 310 | 335 | Jun 1962 | Operating · retirement planned | Dec 2026 | coming soon |
| 5 | Natural Gas Steam Turbine | ST | 495 | 480 | Mar 1964 | Operating · retirement planned | Dec 2026 | coming soon |
| 1A | Natural Gas Fired Combined Cycle | CT | 231 | 226 | planned Apr 2020 | not_current | — | coming soon |
| 1B | Natural Gas Fired Combined Cycle | CT | 231 | 226 | planned Apr 2020 | not_current | — | coming soon |
| 1S | Natural Gas Fired Combined Cycle | CA | 231 | 192 | planned Apr 2020 | not_current | — | coming soon |
| GEN1 | — | ST | 175 | 175 | Sep 1956 | not_current | — | coming soon |
| GEN2 | — | ST | 175 | 175 | Feb 1957 | not_current | — | coming soon |
| GEN3 | — | ST | 320 | 320 | Dec 1961 | not_current | — | coming soon |
| GEN4 | — | ST | 320 | 320 | Jun 1962 | not_current | — | coming soon |
| GEN5 | — | ST | 480 | 480 | Mar 1964 | not_current | — | coming soon |
| GEN6 | — | ST | 480 | 480 | Sep 1966 | not_current | — | coming soon |
| GEN7 | Natural Gas Fired Combustion Turbine | GT | 133 | 133 | Jul 1969 | not_current | — | coming soon |
| 1 | Natural Gas Steam Turbine | ST | 156 | 175 | Sep 1956 | Retired Dec 2019 | — | coming soon |
| 2 | Natural Gas Steam Turbine | ST | 156 | 175 | Feb 1957 | Retired Dec 2019 | — | coming soon |
| 6 | Natural Gas Steam Turbine | ST | 495 | 495 | Sep 1966 | Retired Dec 2019 | — | coming soon |
| 7 | Natural Gas Fired Combustion Turbine | GT | 133 | 133 | Jul 1969 | Retired Dec 2003 | — | coming soon |
Owner / operator
Operator: AES Alamitos LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| AES Alamitos LLC | 100.0% | 1,115 MW |
Nearby plants
Within 80 km.
| AES ES Alamitos 2 LLC | 82 MW | 0.2 km |
| AES Alamitos Energy Center | 678 MW | 0.2 km |
| AES ES Alamitos, LLC | 100 MW | 0.2 km |
| Haynes | 1,739 MW | 0.5 km |
| CSU Long Beach | 3 MW | 1.8 km |
| CSU Long Beach Lots 7 & 14 | 5 MW | 1.8 km |