← Back to map

Drawhorn SolarPlanned

Hancock County, Georgia · EIA plant ID 67989 · Operator: Drawhorn Solar, LLC
SolarBA: SOCO

80 MW planned (Solar Photovoltaic), first expected Nov 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PGR28Solar PhotovoltaicPV8080planned Nov 2027Planned—coming soon

Owner / operator

Operator: Drawhorn Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Washington County Power LLC796 MW14.8 km
Sinclair Dam45 MW19.6 km
AL Sandersville LLC692 MW19.9 km
Putnam Erikson 23 MW24.8 km
Tri-County Solar Facility1 MW34 km
Putnam Erickson3 MW34.5 km