Putnam Erikson 2
Putnam County, Georgia · EIA plant ID 65759 · Operator: SolAmerica Energy, LLC
Nameplate3MWSummer 3 MW
Generators1in service
Net generation5GWh12 mo to Dec 2025
Capacity factor20%solar units, summer MW
Heat rate—thermal plants only
First online2021
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2022 | 6.2 | 24.4% | — |
| 2023 | 5.7 | 22.6% | — |
| 2024 | 5.7 | 22.3% | — |
| 2025 | 5.2 | 20.4% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| PE2 | Solar Photovoltaic | PV | 2.9 | 2.9 | Nov 2021 | Operating | — | coming soon |
Owner / operator
Operator: SolAmerica Energy, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| SolAmerica Energy, LLC | 100.0% | 3 MW |
Nearby plants
Within 80 km.
| Tri-County Solar Facility | 1 MW | 9.2 km |
| Putnam Erickson | 3 MW | 9.8 km |
| Sinclair Dam | 45 MW | 21.6 km |
| Drawhorn Solar | — | 24.8 km |
| Washington County Power LLC | 796 MW | 36 km |
| Greene Durham | 3 MW | 43.8 km |