Athens Solar I (Hybrid)Planned

Placer County, California · EIA plant ID 67982 · Operator: vesper energy development llc
SolarCAISOBA: CISO

500 MW planned (Batteries, Solar Photovoltaic), first expected Jun 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ATHS1Solar PhotovoltaicPV250250planned Jun 2028Planned—coming soon
ATHSBBatteriesBA250250planned Jun 2028Planned—coming soon

Owner / operator

Operator: vesper energy development llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Nacimiento Hydro Project4 MW47.5 km
Salinas River Cogeneration39 MW53.3 km
Aera San Ardo Cogen Facility3 MW54 km
Sargent Canyon Cogeneration38 MW54.9 km
King City Power Plant133 MW58 km
King City Peaking47 MW58.1 km