Monterey County, California · EIA plant ID 10294 · Operator: Calpine King City Cogen LLC
Natural gasNatural Gas Fired Combined CycleCAISOBA: CISO
Nameplate133MWSummer 115 MW
Generators2in service
Net generation34GWh12 mo to Aug 2026
Capacity factor3%gas/coal/oil units, summer MW
Heat rate7,821Btu/kWhfossil units, electric fuel, HHV
First online1989Runs as peaking

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0255075100GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%200520102015202020253.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
7,5008,0008,500200520102015202020257,821 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001867.7——
2002999.3——
2003902.592.8%8,624
2004899.992.3%8,606
2005783.180.5%8,606
2006767.779.0%8,606
2007396.540.8%8,589
2008478.449.1%8,582
2009623.664.1%8,166
2010589.860.7%8,655
2011599.761.7%8,491
2012501.251.4%8,629
2013409.742.1%8,597
2014511.852.6%8,491
2015441.645.4%8,513
2016419.243.0%7,859
2017383.439.4%7,852
2018374.738.5%7,845
2019161.416.6%7,833
202061.66.3%7,803
202184.18.6%7,783
202260.16.0%7,825
202356.45.6%7,831
2024383.8%7,843
202524.32.4%7,838

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GTGNatural Gas Fired Combined CycleCT90.880Feb 1989Operating—coming soon
STGNatural Gas Fired Combined CycleCA42.435Mar 1989Operating—coming soon

Owner / operator

Operator: Calpine King City Cogen LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Calpine King City Cogen LLC100.0%133 MW

Nearby plants

Within 80 km.
King City Peaking47 MW0.3 km
Foundation Scheid Vineyards2 MW7.9 km
Blackjack Solar4 MW10.3 km
City of Soledad Water Reclamation1 MW28.9 km
Foundation Dole Fresh Vegetables6 MW32.8 km
Foundation California Training Facility2 MW35 km