Foundation Dole Fresh Vegetables
Monterey County, California · EIA plant ID 62654 · Operator: Foundation CA Fund X Manager LLC
Nameplate6MWSummer 6 MW
Generators2in service
Net generation18GWh12 mo to Dec 2025
Capacity factor36%wind units, summer MW
Heat rate—thermal plants only
First online2022
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2022 | 5.3 | 25.6% | — |
| 2023 | 18.1 | 36.8% | — |
| 2024 | 17.1 | 34.7% | — |
| 2025 | 17.6 | 35.9% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| WTG1 | Onshore Wind Turbine | WT | 2.8 | 2.8 | Aug 2022 | Operating | — | ge 2.5-127 |
| WTG2 | Onshore Wind Turbine | WT | 2.8 | 2.8 | Aug 2022 | Operating | — | ge 2.5-127 |
Owner / operator
Operator: Foundation CA Fund X Manager LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Foundation CA Fund X Manager LLC | 100.0% | 6 MW |
Nearby plants
Within 80 km.
| Foundation SaIinas Valley State Prison | 2 MW | 2.5 km |
| Foundation California Training Facility | 2 MW | 2.9 km |
| CA-DGS RFP-Salinas Valley State Prison | 3 MW | 3.2 km |
| CA-DGS- RFP-Correctional Training Fac | 2 MW | 3.2 km |
| City of Soledad Water Reclamation | 1 MW | 4.3 km |
| Ameresco Johnson Canyon | 1 MW | 9.8 km |