← Back to map

Timbermill Wind, LLC

Chowan County, North Carolina · EIA plant ID 67910 · Operator: Timbermill Wind
WindOnshore Wind TurbinePJMBA: PJM
Nameplate189MWSummer 189 MW
Generators1in service
Net generation365GWh12 mo to Aug 2026
Capacity factor22%wind units, summer MW
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202420252026202722.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202421.115.0%—
2025375.622.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
TIMBYOnshore Wind TurbineWT189189Dec 2024Operating—vestas V150-4.2

Owner / operator

Operator: Timbermill Wind. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Apex Clean Energy100.0%189 MW

Nearby plants

Within 80 km.
Davis Lane Solar, LLC5 MW8.1 km
Sun Farm VI, LLC5 MW9.4 km
Alpha Value Solar5 MW10 km
Sun Farm V, LLC5 MW10.1 km
Hertford Solar Farm5 MW10.2 km
Edenton Solar5 MW12 km