Perquimans County, North Carolina · EIA plant ID 62054 · Operator: SunStrong Management
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate5MWSummer 5 MW
Generators1in service
Net generation9GWh12 mo to Dec 2025
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2019

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.51GWh202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2019202020212022202320242025202620.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201900.0%—
20203.88.6%—
20219.120.7%—
20228.920.2%—
20238.619.6%—
20248.920.3%—
2025920.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
AVS01Solar PhotovoltaicPV55Dec 2019Operating—coming soon

Owner / operator

Operator: SunStrong Management. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SunStrong Management100.0%5 MW

Nearby plants

Within 80 km.
Sun Farm V, LLC5 MW0.4 km
Hertford Solar Farm5 MW3 km
Sun Farm VI, LLC5 MW5 km
Davis Lane Solar, LLC5 MW6.6 km
Two Mile Desert Project16 MW7.4 km
Two Mile Solar5 MW7.7 km