Bellefield 3 Solar and Battery StoragePlanned

Kern County, California · EIA plant ID 67894 · Operator: 51LV 8me, LLC
SolarCAISOBA: CISO

300 MW planned (Batteries, Solar Photovoltaic), first expected May 2030 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
51LVASolar PhotovoltaicPV150150planned May 2030Planned—coming soon
51LVBBatteriesBA150150planned May 2030Planned—coming soon

Owner / operator

Operator: 51LV 8me, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Bellefield 2 Solar & Energy Storage Farm—7.1 km
Aratina Solar Center 2—9.5 km
Bellefield Solar and Energy Storage Farm1,000 MW9.5 km
Edwards Sanborn E5115 MW10.5 km
Sanborn Hybrid 3—11.7 km
Edwards Sanborn S460 MW11.7 km