← Back to map

Sanborn Hybrid 3Under construction

Kern County, California · EIA plant ID 69956 · Operator: Terra-Gen Operating Co-Hybrid
SolarCAISOBA: CISO

578 MW under construction (Batteries, Solar Photovoltaic), first expected Oct 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 578 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
S10BSBatteriesBA210210planned Dec 2026Under construction—coming soon
S10PVSolar PhotovoltaicPV210210planned Dec 2026Under construction—coming soon
S8Solar PhotovoltaicPV5555planned Oct 2026Under construction—coming soon
S9Solar PhotovoltaicPV103103planned Dec 2026Under construction—coming soon

Owner / operator

Operator: Terra-Gen Operating Co-Hybrid. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Edwards Sanborn S460 MW1.9 km
Edwards Sanborn S371 MW2.4 km
PRC-Desoto Intl/PPG Aerospace2 MW3.4 km
Edwards Sanborn E1A293 MW3.9 km
Edwards Sanborn S185 MW3.9 km
Edwards Sanborn E1B290 MW4 km