← Back to map

Harris Farms Solar Facility

Fresno County, California · EIA plant ID 67868 · Operator: Harris Farms Inc
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor28%solar units, summer MW
Heat rate—thermal plants only
First online2024

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh20242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20242025202628.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2024331.0%—
20253.228.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
HF1Solar PhotovoltaicPV1.31.3Mar 2024Operating—coming soon

Owner / operator

Operator: Harris Farms Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Harris Farms Inc100.0%1 MW

Nearby plants

Within 80 km.
CDCR (CA) - Pleasant Valley State Prison1 MW12.9 km
DSH (CA) - Coalinga State Hospital2 MW12.9 km
Gates Solar Station20 MW13.4 km
CA-DGS RFP-Pleasant Valley State Prison2 MW13.8 km
Coalinga 6C Cogen7 MW14.6 km
Five Points Solar Park60 MW14.9 km