← Back to map

Liberty Hybrid Solar and Storage Project

Harris County, Texas · EIA plant ID 67867 · Operator: Liberty 1 Solar LLC
SolarBatteriesSolar PhotovoltaicERCOTBA: ERCO
Nameplate132MWSummer 132 MW
Generators2in service
Net generation112GWh12 mo to Aug 2026
Capacity factor20%solar units, summer MW
Heat rate—thermal plants only
First online2025

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0510GWh2026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%20252026202719.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202553.418.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
LIB1Solar PhotovoltaicPV67.267.2Jul 2025Operating—coming soon
LIB2BatteriesBA6565Mar 2026Operating—coming soon

Owner / operator

Operator: Liberty 1 Solar LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Liberty 1 Solar LLC100.0%132 MW

Nearby plants

Within 80 km.
WAL5221 MW13 km
WAL7441 MW13.2 km
Noor Solar—13.2 km
Destiny Storage200 MW13.7 km
Citadel Battery Storage Plant204 MW15.2 km
Crosby Clean Energy Center (BESS)12 MW15.4 km