BatteryBatteriesERCOTBA: ERCO
Nameplate204MWSummer 204 MW
Generators1in service
Net generation-33GWh12 mo to Aug 2026
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-4-3-2-10GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2024-1——
2025-27.8——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CITDLBatteriesBA204204Dec 2024Operating—coming soon

Owner / operator

Operator: Citadel BESS LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Citadel BESS LLC100.0%204 MW

Nearby plants

Within 80 km.
Crosby Clean Energy Center (BESS)12 MW0.2 km
Destiny Storage200 MW1.6 km
Remy Jade Power Station484 MW2.9 km
WAL5221 MW5 km
Noor Solar—6.3 km