Kingstree East 230 Solar ProjectPlanned

Georgetown County, South Carolina · EIA plant ID 67862 · Operator: Kingstree East 230 LLC
SolarBA: SC

249 MW planned (Solar Photovoltaic), first expected Dec 2029 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SOLARSolar PhotovoltaicPV249249planned Dec 2029Planned—coming soon

Owner / operator

Operator: Kingstree East 230 LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Georgetown LFGTE1 MW18.3 km
Cherry Blossom Solar LLC10 MW22.1 km
SR Georgetown—26 km
International Paper Georgetown Mill96 MW27.1 km
SR Lambert II100 MW27.3 km
SR Lambert I, LLC100 MW27.3 km