← Back to map

Cherry Blossom Solar LLC

Williamsburg County, South Carolina · EIA plant ID 63505 · Operator: CBH Lessor LLC
SolarSolar PhotovoltaicBA: CPLE
Nameplate10MWSummer 10 MW
Generators1in service
Net generation19GWh12 mo to Dec 2025
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2019

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.511.52GWh202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2019202020212022202320242025202621.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20190.45.2%—
202020.823.6%—
202120.523.4%—
202220.623.5%—
202320.923.8%—
202418.721.3%—
202518.921.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CBSolar PhotovoltaicPV1010Dec 2019Operating—coming soon

Owner / operator

Operator: CBH Lessor LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
CBH Lessor LLC100.0%10 MW

Nearby plants

Within 80 km.
Kingstree East 230 Solar Project—22.1 km
Goldenrod Solar2 MW24.3 km
Willis Solar2 MW26.6 km
South Solar2 MW29.3 km
Blacktip Solar2 MW31.5 km
Sapphire Solar2 MW33.2 km