← Back to map

Westwing

Maricopa County, Arizona · EIA plant ID 67855 · Operator: aes clean energy
BatteryBatteriesBA: AZPS
Nameplate200MWSummer 200 MW
Generators2in service
Net generation-57GWh12 mo to Aug 2026
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-20-15-10-50GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2024-5.4——
2025-21.7——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WEST2BatteriesBA118118May 2025Operating—coming soon
WESTWBatteriesBA8282Sep 2024Operating—coming soon

Owner / operator

Operator: aes clean energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
aes clean energy100.0%200 MW

Nearby plants

Within 80 km.
Desert Bloom150 MW1.1 km
Beehive Energy Storage250 MW10.8 km
Lake Pleasant WTP7 MW14.3 km
Northwest Regional3 MW14.5 km
Waddell40 MW15.4 km
El Sol BESS50 MW16.2 km