← Back to map

Lake Pleasant WTP

Maricopa County, Arizona · EIA plant ID 58539 · Operator: GSRP
SolarSolar PhotovoltaicBA: AZPS
Nameplate7MWSummer 6 MW
Generators1in service
Net generation14GWh12 mo to Dec 2025
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2012

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.511.5GWh2013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%201420162018202020222024202626.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201311.179.3%—
201415106.8%—
201513.325.3%—
201615.228.9%—
201714.928.4%—
201814.828.1%—
201914.627.8%—
20201528.4%—
202114.527.6%—
202214.928.4%—
202314.427.4%—
202412.924.6%—
202513.926.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV6.56Dec 2012Operating—coming soon

Owner / operator

Operator: GSRP. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Wells Fargo Equipment Finance Inc100.0%7 MW

Nearby plants

Within 80 km.
Beehive Energy Storage250 MW3.7 km
Waddell40 MW4 km
Westwing200 MW14.3 km
Desert Bloom150 MW15.1 km
Scatter Wash 1170 MW18.9 km
Scatter Wash 285 MW18.9 km