Barone
Sullivan County, New York · EIA plant ID 67613 · Operator: Generate Capital
Nameplate3MWSummer 3 MW
Generators1in service
Net generation6GWh12 mo to Dec 2025
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2024
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2024 | 4 | 20.1% | — |
| 2025 | 5.6 | 21.5% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 11034 | Solar Photovoltaic | PV | 3 | 3 | Apr 2024 | Operating | — | coming soon |
Owner / operator
Operator: Generate Capital. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Generate NY Community Solar VI | 100.0% | 3 MW |
Nearby plants
Within 80 km.
| CMR Solar LLC | 2 MW | 10 km |
| Svenski Solar (Hybrid) | 4 MW | 13.1 km |
| Fogarty CSG | 2 MW | 13.2 km |
| Shoddy Hollow | 5 MW | 14.1 km |
| Dubois Solar (Hybrid) | 4 MW | 14.2 km |
| Rosemond Solar Community Solar | 2 MW | 14.6 km |