Svenski Solar (Hybrid)
Orange County, New York · EIA plant ID 66232 · Operator: Generate Capital
Nameplate4MWSummer 4 MW
Generators2in service
Net generation3GWh12 mo to Dec 2025
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2022
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2022 | 1.9 | — | — |
| 2023 | 1.8 | — | — |
| 2024 | 2.6 | — | — |
| 2025 | 3.3 | — | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 10894 | Solar Photovoltaic | PV | 2 | 2 | Apr 2022 | Operating | — | coming soon |
| BAT | Batteries | BA | 2 | 2 | Apr 2022 | Operating | — | coming soon |
Owner / operator
Operator: Generate Capital. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Generate NY Community Solar Lessor III | 100.0% | 4 MW |
Nearby plants
Within 80 km.
| CMR Solar LLC | 2 MW | 3.5 km |
| Fogarty CSG | 2 MW | 3.7 km |
| Dubois Solar (Hybrid) | 4 MW | 7.7 km |
| TBE-Montgomery LLC | — | 9.6 km |
| Maybrook Solar, LLC (CSG) | 5 MW | 10.2 km |
| RT 52 Walden Solar 1, LLC Hybrid | 9 MW | 10.4 km |