← Back to map

RT 52 Walden Solar 1, LLC Hybrid

Orange County, New York · EIA plant ID 63000 · Operator: AES Distributed Energy
SolarBatteriesSolar PhotovoltaicNYISOBA: NYIS
Nameplate9MWSummer 9 MW
Generators2in service
Net generation5GWh12 mo to Dec 2025
Capacity factor11%solar units, summer MW
Heat rate—thermal plants only
First online2019

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%2019202020212022202320242025202610.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201900.0%—
20204.710.8%—
20215.813.2%—
20227.416.3%—
20236.414.7%—
20245.813.2%—
20254.710.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BESSBatteriesBA44Jan 2020Operating—coming soon
WALDNSolar PhotovoltaicPV55Dec 2019Operating—coming soon

Owner / operator

Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AES Distributed Energy100.0%9 MW

Nearby plants

Within 80 km.
Grabinski2 MW3.1 km
Walden2 MW3.2 km
Dubois Solar (Hybrid)4 MW6 km
FFP - NY Ruggirello CSG2 MW6.7 km
Walden NY 12 MW6.8 km